{UPDATED} – TENDER FOR SUPPLY OF A BRAND-NEW MOTOR VEHICLE FOR LAKE VICTORIA BASIN COMMISSION – Reference Number: LVBC/GDS/23-24/04

Submitted by on 17 November 2023


EAST AFRICAN COMMUNITY
LAKE VICTORIA BASIN COMMISSION

TENDER FOR SUPPLY OF NEW MOTOR VEHICLE FOR LAKE VICTORIA BASIN COMMISSION:

Reference No. LVBC/GDS/23-24/04

Lake Victoria Basin Commission (LVBC) has received financing from GIZ under the strengthening institutional capacity of LVBC Project and invites eligible bidders to tender for Supply of Motor Vehicle as per below details:

Reference NumberDescriptionBrief Requirements
LVBC/GDS/23-24/04Supply of Brand New Motor Vehicle • Station Wagon
• Automatic
• Four-wheel Drive
• Fuel Type – Diesel

To download the detailed tender document, click the download links below. Interested and eligible bidders may obtain further information from the LVBC.

Sealed Bids must be addressed as below and delivered on or before 11th December 2023 at 11.00 am local time indicating the Tender Name and Reference Number and delivered to the Tender Box. Bid opening shall be on 11th December 2023 at 11.30 a.m. for bidders or representatives who choose to attend. Telegraphic, Fax, E-mail and other electronic submissions will not be accepted. No liability will be acceptable for loss or late delivery and late submissions will be rejected. 

Executive Secretary
East African Community
Lake Victoria Basin Commission
13th Floor, New Nyanza Regional Headquarters, Owuor Otiende Road
P. O. Box 1510 – 40100, Kisumu, KENYA
Telephone Number: +254 57 2023894/73, +254 57 2026344

For more information or clarification, please contact us on the address above or through e-mail: procurement@lvbcom.org.Any changes or modifications will be communicated on the LVBC and EAC Websites.

ADDENDUM I

TENDER FOR SUPPLY OF A BRAND-NEW MOTOR VEHICLE FOR LAKE VICTORIA BASIN COMMISSION: Ref: LVBC/GDS/23-24/04

ReferenceIssueAMMENDMENT
ITB 1.1The name and identification number of the Contract is: TENDER FOR SUPPLY OF A BRAND-NEW MOTOR VEHICLE FOR LAKE VICTORIA BASIN COMMISSION: REFERENCE NO. LVBC/GDS/23-24/04  The name and identification number of the Contract is:   LOT 1: SUPPLY OF A BRAND-NEW MOTOR VEHICLE FOR LAKE VICTORIA BASIN COMMISSION UNDER GIZ PROJECT   LOT 2: SUPPLY OF A BRAND-NEW MOTOR VEHICLE FOR LAKE VICTORIA BASIN COMMISSION UNDER LVBC SECRETARIAT
ITB 23.1  The deadline for bid submission is: Date: 11th December 2023 Time: 1100hrs EA TimeThe deadline for bid submission is:   Date: 9th January 2024 Time: 1100hrs EA Time
ITB 26.1The bid opening shall take place at: Date:  11th December 2023 Time:  1130hrs EA TimeThe bid opening shall take place at:   Date:  9th January 2024 Time:  1130hrs EA Time
Technical Offer Form (Revised Quantities)Quantity – 1Quantity  Lot 1 – 1Lot 2 – 1            
List of Goods and Delivery ScheduleQuantity – 1Quantity  Lot 1 – 1Lot 2 – 1   
Technical Specifications Brand New Project Motor VehicleSpecifications for Supply of a Brand-New Station Wagon Vehicle for the Lake Victoria Basin Commission under GIZ Project.  Specifications for Supply of a Brand-New Station Wagon Vehicle for the Lake Victoria Basin Commission: Lot 1: under GIZ Project Lot 2: LVBC Secretariat

All other Contract conditions remain unchanged.

Dr. Masinde K. Bwire
EXECUTIVE SECRETARY
Date: 7th December 2023

Downloads

Share this content


PROGRAMS & PROJECTS

LVB IWRMP

Lake Victoria Basin Integrated Water Resources Management Programme (LVB IWRMP) Lake Victoria Integrated Water Resources Management Programme (LVB IWRMP) is a regional programme coordinated by Lake Victoria Basin Commission (LVBC) and implemented in the four Partner States of the East ...
Read More

ACC-LVB

Adapting to Climate Change in Lake Victoria Basin Project (ACC-LVB)
Read More

ScaleWays Project

Scaling out resilient Water and Agricultural Systems (ScaleWAYS) is a project implemented under the broader framework of Advancing Water Futures and Scenarios (WFaS East Africa: Accelerating transition towards resilient water and Food Systems). It’s a research project that would be ...
Read More

EPSGG-LVB

Project on engaging private sector for green growth in Lake Victoria Basin (EPSGG-LVB)
Read More

PREPARED

The Planning for Resilience in East Africa through Policy, Adaptation, Research and Economic Development (PREPARED) is a medium-term, multi-organization program partially implemented in the East African Community.
Read More

LVWATSAN II

Lake Victoria Water Supply and Sanitation (LVWATSAN II) is the programme of the East African Community (EAC), coordinated by Lake Victoria Basin Commission (LVBC) implemented in 15 towns of the 5 Partner States of the Community. The African Development Bank ...
Read More




EVENTS




NEWS

REPUBLIC OF KENYA AND THE UNITED REPUBLIC OF TANZANIA COMMIT TO FIFTEEN POINT PLAN FOR MARA RIVER BASIN CONSERVATION AT 13TH MARA DAY CELEBRATIONS

The Republic of Kenya and the United Republic of Tanzania Kenya have jointly committed to implementing a 15-point strategy to protect the Mara River basin, a crucial ecosystem for the Masai Mara and Serengeti parks that is facing degradation risks. ...
Read More

LVBC AUGUST 2024 MONTHLY REVIEW

Read More

13TH MARA DAY IN NAROK: LEADERS TO HIGHLIGHT CONSERVATION EFFORTS

Preparations for the 13th Mara Day celebration have been finalized. The annual event will be held in Narok County, Republic of Kenya from 12th to 15th September. The scientific conference is scheduled for September 14th at the Maasai Mara University, ...
Read More

NEW LVBC HEADQUARTERS ON TRACK FOR TIMELY COMPLETION

The construction of the ultra modern Lake Victoria Basin Commission Headquarters is on course. Already the construction of the office block wing B is 75% complete while wing A is at 45%. The construction of the middle core is also ...
Read More

MASAI MARA UNIVERSITY TO HOST THE 13TH MARA DAY SCIENTIFIC CONFERENCE.

The 13th Mara day scientific conference will be held in Masai Mara University, Narok County, in the Republic of Kenya. Lake Victoria Basin Commission (LVBC) has partnered with Masai Mara University to hold the scientific conference on 14th September 2024. ...
Read More

WATER QUALITY MANAGEMENT STRATEGY AND ACTION PLAN SUBMITTED TO EAST AFRICAN COMMUNITY PARTNER STATES FOR APPROVAL. 

The final draft for Water Quality Management (WQM) strategy and action plan, which was validated by regional experts from partner states and Nile Basin Initiative centers in March 2024 has already been submitted to Partner States for their record and ...
Read More