PREQUALIFICATION NOTICE FOR CONSULTANTS – FEASIBILITY STUDY IN MUKUNGWA WETLAND IN RWANDA – Tender No: LVBC/NbS/CS/23-24/09 – KFW 510725

Submitted by on 16 March 2024


EAST AFRICAN COMMUNITY

LAKE VICTORIA BASIN COMMISSION

Consulting Services Fostering the Potential of Lake Victoria – Feasibility Study – Mukungwa WetlandSubmission date / deadline: 26 April 2024

Country: East African Community

Tender No: LVBC/NbS/CS/23-24/09 – KFW 510725

Reference: BMZ 202068948 / KFW 47975

Pre-Qualification Notice for Consultants

Reference: International open Tender for Consultancy Services for Elaboration of a Feasibility Study aiming to prepare the Integrated Mukungwa Wetland and Landscape Restoration Project in Rwanda.

Financing Source: Federal Republic of Germany; Financial Cooperation through KfW Entwicklungsbank and Lake Victoria Basin Commission (LVBC).

Project Executing Agency (PEA): Lake Victoria Basin Commission (LVBC), P.O. Box 1510-40100, Kisumu, Kenya.

Requested Consulting Services:

The Government of Rwanda (GoR) through Rwanda Environment Management Authority (REMA) – with REMA acting as the National Project Executing Agency (NPEA) – intends to implement the “Integrated Mukungwa Wetland and Landscape Restoration Project” with financial support from KfW through Lake Victoria Basin Commission (LVBC), with LVBC acting as the Project Executing Agency (PEA).

Numerous climate change impacts on various sectors can already be observed or are very likely to be expected in the near future within the project area:

  • High surface water run-off – due to increased precipitation patterns – lead to increased soil erosion and to higher sediment loads in the Mukungwa catchment area.
  • Increased sedimentation effects in surface water bodies negatively affect electricity production by hydro-power stations.
  • Low level electricity production prevents economic development and further enhances the dependency on decentralized small-scale agricultural activities.
  • Population growth in combination with non-existing or inadequate wastewater collection and treatment facilities increases the pollution of surface water and groundwater resources.
  • Increasing pollution within the Mukungwa catchment area negatively affects
  • the biodiversity of Munkungwa wetlands and its riparian landscape, including forests and thus their attractivity for tourism development
  • the availability of high quality water resources for the drinking water supply system and thus the health of the population within the project area
  • the availability of high quality water for irrigation of agricultural land and thus to ensure safe food production
  • the water quality and thus the aquatic biodiversity of the downstream Lake Victoria basin

The focus of the project will be the development of Mukungwa Eco-Park and the restoration of its riparian landscape. REMA together with Musanze District intends to design and convert Mukungwa wetland into an urban wetland recreation and eco-tourism park.

In this context the Lake Victoria Basin Commission (LVBC) – with financial assistance from the German Government through KfW Entwicklungsbank – now intends to engage a Consultant for the elaboration of a Feasibility Study of a total study duration of 8 months, which comprises:

  • to conduct all relevant baseline studies
  • to develop relevant alternative concepts and preliminary designs for proposed infrastructure measures
  • to elaborate corresponding investment and operation cost estimates.

The results of these investigations, concept and preliminary design services as well as cost estimates shall assess the project feasibility and will thus serve as the basis for appraisal and implementation of the Project. It shall, in consequence, provide all data necessary for the appraisal of a Financial Cooperation Project.

The assignment shall also include all relevant Consulting Services related to a Climate Impact Assessment (CIA) as well as an Environmental and Social Impact Assessment (ESIA) of the proposed project.

The expected output, the Feasibility Study, shall comprise, however may not necessarily be limited to the following aspects:

  • general project issues
  • technical and financial project issues
  • institutional and financial project viability
  • project implementation modalities and concept.
  • climate impact assessment (CIA)
  • environmental and social impact assessment (ESIA)

The prequalification of experienced Consultants will follow the latest version of KfW “Guidelines for the Procurement of Consulting Services, Works, Plant, Goods and Non-Consulting Services in Financial Cooperation with Partner Countries” (please refer to homepage of KfW Development Bank www.kfw-entwicklungsbank.de).

It is foreseen to assign an independent consultant firm with proven international experience in the integrated water resources management (IWRM) sector and having a regional experience record. In case of an international lead consultant it is recommended to associate with a local consulting firm. The minimum annual turnover of the consultant is fixed at EUR 10.0 million, with – in case of a Joint Venture – the minimum annual turnover of the lead consultant being EUR 7.0 million.

An “Invitation for Pre-Qualification” (PQ) with more detailed information on the program’s components and measures, the type of services to be provided as well as the documents to be submitted for prequalification, including the envisaged evaluation methodology, is available upon written request from the Tender Agent, Prof. Dr.-Ing. Clemens Wittland at the email: clemens.wittland@h-ka.de and copy to the LVBC – Project Coordinator; Mr. Paul KARIUKI at the email: kariuki@lvbcom.org and copy to the LVBC Procurement department at the email: procurement@lvbcom.org . The invitation for PQ will be distributed electronically.

Applications for prequalification shall be submitted electronically by an e-procurement system as well as in hard copies (to the PEA and to the Tender Agent) at or before 11:00 hours (EAT) on Friday, 26 April 2024 with the hard copies clearly marked Tender No. LVBC/NbS/CS/23-24/09 – KFW 510725 – Application to Prequalify for “Fostering the Potential of Lake Victoria – Feasibility Study for Integrated Mukungwa Wetland and Landscape Restoration Project.

Share this content


PROGRAMS & PROJECTS

LVB IWRMP

Lake Victoria Basin Integrated Water Resources Management Programme (LVB IWRMP) Lake Victoria Integrated Water Resources Management Programme (LVB IWRMP) is a regional programme coordinated by Lake Victoria Basin Commission (LVBC) and implemented in the four Partner States of the East ...
Read More

ACC-LVB

Adapting to Climate Change in Lake Victoria Basin Project (ACC-LVB)
Read More

ScaleWays Project

Scaling out resilient Water and Agricultural Systems (ScaleWAYS) is a project implemented under the broader framework of Advancing Water Futures and Scenarios (WFaS East Africa: Accelerating transition towards resilient water and Food Systems). It’s a research project that would be ...
Read More

EPSGG-LVB

Project on engaging private sector for green growth in Lake Victoria Basin (EPSGG-LVB)
Read More

PREPARED

The Planning for Resilience in East Africa through Policy, Adaptation, Research and Economic Development (PREPARED) is a medium-term, multi-organization program partially implemented in the East African Community.
Read More

LVWATSAN II

Lake Victoria Water Supply and Sanitation (LVWATSAN II) is the programme of the East African Community (EAC), coordinated by Lake Victoria Basin Commission (LVBC) implemented in 15 towns of the 5 Partner States of the Community. The African Development Bank ...
Read More




EVENTS




NEWS

COUNCIL OF MINISTERS APPROVES ADDITIONAL FUNDING FOR THE CONSTRUCTION OF THE NEW LVBC HEADQUARTERS

The East African Community Council of Ministers meeting has approved an additional funding of USD 802,126 for the completion of the new Lake Victoria Basin Commission headquarters in Kisumu. East African Community Secretary General H.E. Hon. Veronica Mueni Nduva announced ...
Read More

LVBC TEAM PARTICIPATES IN COP 29 IN BAKU, AZERBAIJAN

Deputy Executive Secretary Eng. Coletha Ruhamya is leading a delegation from the Lake Victoria Basin Commission at the 29th Conference of the Parties of the UNFCCC (COP 29) in Baku, Azerbaijan. The LVBC team is set to host a side ...
Read More

FINANCE AND ADMINISTRATION COMMITTEE APPLAUDS PROGRESS ON NEW LVBC HEADQUARTERS CONSTRUCTION

The East African Community members of the Finance and Administration Committee have praised the Lake Victoria Basin Commission for the progress made on the construction of its new headquarters. Led by Honorable Andrea Aguer Ariik Malueth, the EAC Deputy Secretary ...
Read More

LVBC HEADQUARTERS CONSTRUCTION HITS 72% MILESTONE.

The construction of the state-of-the-art Lake Victoria Basin Commission Headquarters is nearing completion. Currently, the overall progress of the building stands at 72%, with external works at 68%. Electrical and mechanical installations are at 62% and 68%, respectively. Office Block ...
Read More

LVBC LAUNCHES MARITIME SAFETY CAMPAIGN TO COMBAT RISING BOAT ACCIDENTS ON LAKE VICTORIA

The Lake Victoria Basin Commission (LVBC) has initiated an extensive campaign to educate communities around Lake Victoria about the importance of maritime safety in an effort to reduce the increasing number of boat accidents. Executive Secretary Dr. Masinde Bwire emphasized ...
Read More

REPUBLIC OF KENYA AND THE UNITED REPUBLIC OF TANZANIA COMMIT TO FIFTEEN POINT PLAN FOR MARA RIVER BASIN CONSERVATION AT 13TH MARA DAY CELEBRATIONS

The Republic of Kenya and the United Republic of Tanzania Kenya have jointly committed to implementing a 15-point strategy to protect the Mara River basin, a crucial ecosystem for the Masai Mara and Serengeti parks that is facing degradation risks. ...
Read More