PREQUALIFICATION NOTICE FOR CONSULTANTS – FEASIBILITY STUDY IN MUKUNGWA WETLAND IN RWANDA – Tender No: LVBC/NbS/CS/23-24/09 – KFW 510725

Submitted by on 16 March 2024


EAST AFRICAN COMMUNITY

LAKE VICTORIA BASIN COMMISSION

Consulting Services Fostering the Potential of Lake Victoria – Feasibility Study – Mukungwa WetlandSubmission date / deadline: 26 April 2024

Country: East African Community

Tender No: LVBC/NbS/CS/23-24/09 – KFW 510725

Reference: BMZ 202068948 / KFW 47975

Pre-Qualification Notice for Consultants

Reference: International open Tender for Consultancy Services for Elaboration of a Feasibility Study aiming to prepare the Integrated Mukungwa Wetland and Landscape Restoration Project in Rwanda.

Financing Source: Federal Republic of Germany; Financial Cooperation through KfW Entwicklungsbank and Lake Victoria Basin Commission (LVBC).

Project Executing Agency (PEA): Lake Victoria Basin Commission (LVBC), P.O. Box 1510-40100, Kisumu, Kenya.

Requested Consulting Services:

The Government of Rwanda (GoR) through Rwanda Environment Management Authority (REMA) – with REMA acting as the National Project Executing Agency (NPEA) – intends to implement the “Integrated Mukungwa Wetland and Landscape Restoration Project” with financial support from KfW through Lake Victoria Basin Commission (LVBC), with LVBC acting as the Project Executing Agency (PEA).

Numerous climate change impacts on various sectors can already be observed or are very likely to be expected in the near future within the project area:

  • High surface water run-off – due to increased precipitation patterns – lead to increased soil erosion and to higher sediment loads in the Mukungwa catchment area.
  • Increased sedimentation effects in surface water bodies negatively affect electricity production by hydro-power stations.
  • Low level electricity production prevents economic development and further enhances the dependency on decentralized small-scale agricultural activities.
  • Population growth in combination with non-existing or inadequate wastewater collection and treatment facilities increases the pollution of surface water and groundwater resources.
  • Increasing pollution within the Mukungwa catchment area negatively affects
  • the biodiversity of Munkungwa wetlands and its riparian landscape, including forests and thus their attractivity for tourism development
  • the availability of high quality water resources for the drinking water supply system and thus the health of the population within the project area
  • the availability of high quality water for irrigation of agricultural land and thus to ensure safe food production
  • the water quality and thus the aquatic biodiversity of the downstream Lake Victoria basin

The focus of the project will be the development of Mukungwa Eco-Park and the restoration of its riparian landscape. REMA together with Musanze District intends to design and convert Mukungwa wetland into an urban wetland recreation and eco-tourism park.

In this context the Lake Victoria Basin Commission (LVBC) – with financial assistance from the German Government through KfW Entwicklungsbank – now intends to engage a Consultant for the elaboration of a Feasibility Study of a total study duration of 8 months, which comprises:

  • to conduct all relevant baseline studies
  • to develop relevant alternative concepts and preliminary designs for proposed infrastructure measures
  • to elaborate corresponding investment and operation cost estimates.

The results of these investigations, concept and preliminary design services as well as cost estimates shall assess the project feasibility and will thus serve as the basis for appraisal and implementation of the Project. It shall, in consequence, provide all data necessary for the appraisal of a Financial Cooperation Project.

The assignment shall also include all relevant Consulting Services related to a Climate Impact Assessment (CIA) as well as an Environmental and Social Impact Assessment (ESIA) of the proposed project.

The expected output, the Feasibility Study, shall comprise, however may not necessarily be limited to the following aspects:

  • general project issues
  • technical and financial project issues
  • institutional and financial project viability
  • project implementation modalities and concept.
  • climate impact assessment (CIA)
  • environmental and social impact assessment (ESIA)

The prequalification of experienced Consultants will follow the latest version of KfW “Guidelines for the Procurement of Consulting Services, Works, Plant, Goods and Non-Consulting Services in Financial Cooperation with Partner Countries” (please refer to homepage of KfW Development Bank www.kfw-entwicklungsbank.de).

It is foreseen to assign an independent consultant firm with proven international experience in the integrated water resources management (IWRM) sector and having a regional experience record. In case of an international lead consultant it is recommended to associate with a local consulting firm. The minimum annual turnover of the consultant is fixed at EUR 10.0 million, with – in case of a Joint Venture – the minimum annual turnover of the lead consultant being EUR 7.0 million.

An “Invitation for Pre-Qualification” (PQ) with more detailed information on the program’s components and measures, the type of services to be provided as well as the documents to be submitted for prequalification, including the envisaged evaluation methodology, is available upon written request from the Tender Agent, Prof. Dr.-Ing. Clemens Wittland at the email: clemens.wittland@h-ka.de and copy to the LVBC – Project Coordinator; Mr. Paul KARIUKI at the email: kariuki@lvbcom.org and copy to the LVBC Procurement department at the email: procurement@lvbcom.org . The invitation for PQ will be distributed electronically.

Applications for prequalification shall be submitted electronically by an e-procurement system as well as in hard copies (to the PEA and to the Tender Agent) at or before 11:00 hours (EAT) on Friday, 26 April 2024 with the hard copies clearly marked Tender No. LVBC/NbS/CS/23-24/09 – KFW 510725 – Application to Prequalify for “Fostering the Potential of Lake Victoria – Feasibility Study for Integrated Mukungwa Wetland and Landscape Restoration Project.

Share this content


PROGRAMS & PROJECTS

LVB IWRMP

Lake Victoria Basin Integrated Water Resources Management Programme (LVB IWRMP) Lake Victoria Integrated Water Resources Management Programme (LVB IWRMP) is a regional programme coordinated by Lake Victoria Basin Commission (LVBC) and implemented in the four Partner States of the East ...
Read More

ACC-LVB

Adapting to Climate Change in Lake Victoria Basin Project (ACC-LVB)
Read More

ScaleWays Project

Scaling out resilient Water and Agricultural Systems (ScaleWAYS) is a project implemented under the broader framework of Advancing Water Futures and Scenarios (WFaS East Africa: Accelerating transition towards resilient water and Food Systems). It’s a research project that would be ...
Read More

EPSGG-LVB

Project on engaging private sector for green growth in Lake Victoria Basin (EPSGG-LVB)
Read More

PREPARED

The Planning for Resilience in East Africa through Policy, Adaptation, Research and Economic Development (PREPARED) is a medium-term, multi-organization program partially implemented in the East African Community.
Read More

LVWATSAN II

Lake Victoria Water Supply and Sanitation (LVWATSAN II) is the programme of the East African Community (EAC), coordinated by Lake Victoria Basin Commission (LVBC) implemented in 15 towns of the 5 Partner States of the Community. The African Development Bank ...
Read More




EVENTS




NEWS

LVBC AUGUST 2024 MONTHLY REVIEW

Read More

13TH MARA DAY IN NAROK: LEADERS TO HIGHLIGHT CONSERVATION EFFORTS

Preparations for the 13th Mara Day celebration have been finalized. The annual event will be held in Narok County, Republic of Kenya from 12th to 15th September. The scientific conference is scheduled for September 14th at the Maasai Mara University, ...
Read More

NEW LVBC HEADQUARTERS ON TRACK FOR TIMELY COMPLETION

The construction of the ultra modern Lake Victoria Basin Commission Headquarters is on course. Already the construction of the office block wing B is 75% complete while wing A is at 45%. The construction of the middle core is also ...
Read More

MASAI MARA UNIVERSITY TO HOST THE 13TH MARA DAY SCIENTIFIC CONFERENCE.

The 13th Mara day scientific conference will be held in Masai Mara University, Narok County, in the Republic of Kenya. Lake Victoria Basin Commission (LVBC) has partnered with Masai Mara University to hold the scientific conference on 14th September 2024. ...
Read More

WATER QUALITY MANAGEMENT STRATEGY AND ACTION PLAN SUBMITTED TO EAST AFRICAN COMMUNITY PARTNER STATES FOR APPROVAL. 

The final draft for Water Quality Management (WQM) strategy and action plan, which was validated by regional experts from partner states and Nile Basin Initiative centers in March 2024 has already been submitted to Partner States for their record and ...
Read More

CONSTRUCTION OF MARITIME RESCUE COORDINATION CENTRE (MRCC) UNDERWAY IN MWANZA, UNITED REPUBLIC OF TANZANIA 

The construction of Maritime Rescue coordination centre (MRCC) is underway in Ilemela, Mwanza City in the United Republic of Tanzania.  Already the construction of the ground floor of the main office and the first floor is at thirty eight percent.  ...
Read More